Phase Lower Deck 1 complete wiring and trackage !

I have completed to a good stoping point for the wiring and trackage for Phase 1 of the lower deck.
Not all endpoints go anywhere but its should be a good point where I can start on some scenery and flesh out the details for the next phase.
Included are the up to date track plan and some photos …

This entry was posted in Uncategorized. Bookmark the permalink.

Leave a Reply